India switched on the overhead power equipment on the Surat–Bilimora section of the Mumbai–Ahmedabad high-speed rail corridor on November 20, the Ministry of Railways said. Jagran reported the milestone, and The Times of India put the length of the elevated stretch at about 50 kilometres.
The wires will supply power to trains on both tracks, and switching them on prepares the section for further testing. The ministry said technical teams will energise the remaining equipment in stages along the 508-kilometre corridor. The latest announcement concerns the power system and gave no opening date for passengers.









